AS9120B, ISO 9001:2015, and FAA AC 0056B Accredited

CK 104 LONG LEAD by Crl Components Inc with NSN 5910-00-113-5499 Available Quote Now!

Mfg Part Number: CK 104 LONG LEAD

Alternate P/N: CK104LONGLEAD

NIIN : 001135499

CAGE Code : 71590

Manufacturer: Crl Components Inc

Item Name : Capacitor Fixed Cer

Here at Internet For Aviation, we have CK 104 LONG LEAD Capacitor Fixed Cer from Crl Components Inc, as well as a variety of other parts from reliable manufacturers. As the only independent distributor with a No China Sourcing policy, we go to great lengths to ensure that we source responsibly when it comes to certified standard items. If you’re in need of a specific CK 104 LONG LEAD to aid you in your aircraft repair capabilities, simply search by NSN part number, NSN or Cage Code on our parts directory. Submit an instant RFQ and a representative will get back to you in as little as 15 minutes.

Note : We Will Not Share Your Information To Any Third Parties.

PRODUCT DETAILS “*” Required Fields Are Compulsory

CONTACT INFORMATION

   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.
  • Upload RFQ SHEET
  • If you have more than one item, upload your spreadsheet here

We pride ourselves in our abilities to deliver quality superior grade aviation parts in a timely schedule. Thanks to the various supply chain locations that we have across the United States. We can execute fast shipping times that outpace our competitors. Unlike other competitors, we can promise same day shipping and delivery right to the very place you need. We’re leaders in our industry thanks to our parts streamlining process which includes quick stock and acquisition of the certified product and fast shipping. For whatever needs you have, be they Capacitor Fixed Cer and CK 104 LONG LEAD parts, we can procure and deliver in a schedule that fits with you! Contact us today for an immediate quote!

NSN Information for Part Number CK 104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item Description:

Capacitor Fixed Cer

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
CK 104 LONG LEADB1CA

  Cross Reference Parts List for NSN 5910001135499

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION10.00/+10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

  Corresponding National Stock Number to CK 104 LONG LEAD

Internet For Aviation USA Flag

We are proud to supply every branch of the United States military



Why Choose Us?

Low Price Warrantied inventory at competitive prices
Find it fast Search the world's largest inventory of electronic components by manufacturer, category or part number
Get it fast All inventory ready to ship from our sellers
Quality guaranteed We sell only warrantied and traceable parts


Semiconductor's Certifications and Memberships

The only independent
distributor with a
NO CHINA SOURCING Pledge
  • All orders are fulfilled in the USA.
  • All shipments must comply with U.S.A export laws.
  • No exceptions.
fallen heroes fund logo

“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”.

Thank You for Visiting.

We Hope that You'll Choose Buy Aviation Parts as Your Quick and Convenient Parts Distributor In the Future.

Request for Quote

We use cookies to ensure that we give you an amazing browsing experience on our website. If you continue to use this site we will assume that you are happy with it.